Material Handling Equipment for Heavy Load Moving

Air supply units, control consoles, hose reels, auxiliary wheels and moving accessories that complete a heavy load handling system.

Industrial material handling equipment for heavy load moving and positioning

Product Overview

Heavy load moving depends on equipment around the air casters as much as on the casters themselves. Air pressure has to be stable at every module, hoses have to reach along the travel route, and equipment sometimes has to be moved without air film at all.

We supply the supporting equipment as individual items or as a complete system, sized to your air caster quantity, travel distance and duty cycle.

Load Capacity & Performance

  • Air supply sized from 3.5 m3/min single-module use up to multi-set systems
  • Pressure regulation range 7 - 12 kgf/cm2
  • Hose reels for short bay moves through long plant routes
  • Auxiliary wheel sets for non-air-film moving
  • Ramps and stands for equipment loading
  • Spare cushions and wear parts for planned maintenance

Technical Specifications

Equipment Typical Specification
Air compressor Sized to total air flow demand (3.5 - 20 m3/min per module set)
Control console Pressure regulation 7 - 12 kgf/cm2 with monitoring
Air hose reel Travel distance matched, swivel mounted with hose protection
Auxiliary wheels Bolt-on wheel sets for moving equipment without air film
Loading ramps Steel ramps sized to equipment weight and entry height
Moving accessories Quick couplings, manifolds, parking feet, spare cushions, tools

Published model data is a selection reference; confirm pressure, flow, module count and rated capacity in the quotation. Auxiliary wheels are optional add-on items quoted separately according to wheel quantity and axle configuration.

Structure & Components

  • Air compressor matched to simultaneous air flow demand
  • Control console with pressure regulation and gauge
  • Hose reel with swivel base and hose guide
  • Auxiliary wheel sets (3-wheel 1-axle up to 20-wheel 4-axle configurations)
  • Loading ramps and support stands
  • Couplings, manifolds, parking feet and spare parts

Floor Requirements

Air casters require a smooth, flat and sealed floor with joints and gaps reviewed for the selected cushion and route. Epoxy-coated concrete, polished concrete and steel plate flooring are recommended. Rough, cracked or unsealed surfaces prevent the air film from forming and must be prepared before installation. We review your floor condition and provide preparation guidance before quotation.

Typical Applications

  • Air film moving systems requiring site air supply
  • Plants setting up in-house heavy load moving capability
  • Maintenance departments supporting multiple production areas
  • Equipment loading and unloading operations
  • Temporary or mobile moving setups
  • System upgrades and spare parts replacement

Customization Options

Systems can be configured to match your equipment and site conditions. Typical customization items:

  • Load capacity from 3.2 T per unit to 1500 T complete platform systems
  • Module size and quantity to match equipment footprint and center of gravity
  • Air supply configuration (compressor, control console, hose reel) sized to your route
  • Control mode: manual, remote wireless or synchronized multi-unit control
  • Application-specific materials and surface treatment, subject to engineering review
  • Custom platform frame, tooling interface and positioning fixtures

Quality Control & Test Support

Confirm the test conditions and documentation for the selected model and order: load review, operation video, inspection record, manual and packing information. Agree any required acceptance test before production.

Review Technical Resources

FAQ

Yes. Air casters require a suitable compressed air supply to form the air film between the air cushion and floor surface. Air flow and pressure requirements are listed in the specification table.
Yes. Pre-shipment test video, product photos, packaging photos and operation guidance can be provided according to order requirements.

See all frequently asked questions →

Plan Your Heavy Load Move

Review system selection, floor condition and air supply before requesting a configuration.

Plan Your Material Handling Equipment Project

Start with your load weight, equipment dimensions and moving route. Share what you know; we will clarify the details needed for a quotation.

OS: baoa87491@gmail.com
Titan: tysonmhe@gmail.com